Quainton Footbridge

LGK were appointed as the contractors for this HLF
funded scheme following the tender procedure required by the HLF.

The agreement with Network Rail for a line closure required that all works
crossing the NR lines had to be completed on a specific date,and within
a given time frame, and LGK met these requirements.

LGK worked closely with both the Structural Engineers and the Architect to
ensure that the design was Interpreted correctly as the location of the bridge was at a key point on the site, and careful co-operation between LGK and their subcontractors, and the design team and the Railway Society ensured that disruption to the working site was kept to an absolute minimum.

Minor problems and amendments within the total package which included groundworks and site works were handled well and the overall scheme is now giving the benefits to our visitors that we were seeking to achieve.

LGK were a good team to work with and we will consider them for any future works appropriate to their primary skills within the site.”