Clifton Lock Layby

Client: The Environment Agency
Main Contractor: Mackley Construction
Engineer: The Halcrow Group Ltd

One of 11 carried out by LG Kimber, the project was part of the ongoing replacement of the existing timber walkways, which are deteriorating and were of insufficient size steel. The piles were supplied and installed by LG Kimber, which included drilling the piles.

The walkway was approx 53 metres long with longitudinal beams supporting cantilevered flooring and hand railing. Also included in our supply were a set of access stairs and an access ladder. The support beams were shot blasted and treated with “Zinga” at our works.